(732) 701-7919 Mon–Fri 9:00 AM–5:00 PM ET support@printmyplans.com

Freehold Township Permits: One Plot Plan for Zoning, Two Drawing Sets for Construction

In Freehold Township, the copy count depends on which office you’re dealing with. The Zoning Office’s application asks for a single legible plot plan or survey, drawn to scale. Once the job reaches the Construction Department, the deck, addition and new-home checklists all call for two sets of drawings. Pools add a third office: Engineering wants three sealed grading plans of its own.

These are the Township’s own checklists, project by project. They’re for Freehold Township, at 1 Municipal Plaza. Freehold Borough is a separate town with its own rules.

Copies by project

Project Zoning Office Construction Department Who can draw the plans
Shed A scaled plot plan or survey; the shed cover sheet asks for two copies of your original survey showing the shed Over 200 sq ft: two sets of detailed drawings or the prefab brochure, plus two copies of the survey to scale Not stated
Deck The permit is processed through zoning Survey showing the deck’s location and size, plus two sets of detail drawings Homeowner or licensed architect. “Contractor may not draw the plans.”
Addition The permit is processed through zoning Copy of the survey showing the addition, plus two sets of drawings Signed and sealed by an architect, or drawn by the homeowner. Licensed plumbers and electricians may draw and seal their own trade plans.
In-ground pool Processed through zoning Two sets of sealed pool specifications, plus a survey showing the pool location and the fence Engineering also wants three grading plans sealed by an NJ professional engineer (see below)
New single-family home Zoning application Two sets of plans sealed by a licensed architect or engineer, plus a sealed survey with the proposed house location Architect or engineer

Sources: the Construction Department’s cover sheets for decks, additions, sheds, in-ground pools and new homes; the zoning application. All accessed Oct 18, 2026.

The two-set count matches the state minimum. New Jersey’s Uniform Construction Code says a paper application for a single-family home must include “at least two copies of plans drawn to scale” (N.J.A.C. 5:23-2.15A, NJ DCA).

Zoning: the $35 step that comes first

The Township’s zoning application (the November 2025 version linked from the Zoning page) asks for:

  • A $35 non-refundable fee for each use or structure, payable to the Township of Freehold. Signs are $75 each.
  • “A copy of a legible plot plan or survey of the property (drawn to scale)” showing all existing and proposed buildings, structures, fencing, signage and parking.
  • Manufacturer’s information if you’re adding a shed.

The Zoning Office says it will approve or deny within ten business days. The deck, addition, shed and pool cover sheets all say the permit goes through zoning, so get this step right first.

Sheds: plan for 192 square feet

Freehold’s documents mention two size lines for sheds, and they mean different things:

  • 192 sq ft is the zoning line. The current zoning application lists “Shed (Under 192 Sq Ft)” and allows one shed per lot. The Zoning Office’s requirements sheet (2014) says the same thing another way: “The maximum size for a shed is 192 square feet (12′ x 16′).”
  • 200 sq ft is the building-permit line. The Construction Department’s shed sheet (2021) says sheds of 200 sq ft and under need a zoning permit only, and bigger ones need the building subcode application plus two sets of detailed drawings or the manufacturer’s brochure. That 200 sq ft figure comes from the state’s construction-permit exemption for small sheds (200 sq ft or less, 10 feet or less tall, with no water, gas, oil or sewer connection; any electrical work still needs its own permit) (N.J.A.C. 5:23-2.14), not a zoning allowance.

So a shed between 192 and 200 sq ft that’s 10 feet tall or less, with no water, gas, oil or sewer connection, wouldn’t need a building permit, but it’s over the size the zoning paperwork describes. We couldn’t find a Township document that settles what Zoning does with one, so if you want anything bigger than 12×16, call the Zoning Office at 732-294-2068 before you draw or print it.

The requirements sheet also caps accessory structures at one story or 16 feet tall, keeps them out of front yards, and lists accessory-structure setbacks by zone. They run from 5 feet (R-25 and denser) to 10 feet (R-40 through R-120 and RR), and 100 feet side and 150 feet rear in the RE zone. Corner and irregular lots get individual answers from the Zoning Office.

Deck drawings: what has to be on the sheet

The deck sheet is unusually specific. Your two sets need to show:

  • footing locations, at least 36″ deep and 12″ wide
  • deck length, width and height
  • stair details, with risers no taller than 8¼”, treads at least 9″ deep and stairs at least 36″ wide
  • guards at least 36″ high when the deck is more than 30″ above grade, with balusters spaced under 4″
  • ledger size, bolt size and layout
  • post, girder and joist sizes and spans
  • flooring type, and the grade and species of the lumber

If a homeowner is drawing the plans, that list doubles as a checklist.

Pools: three offices, two different counts

The Construction sheet asks for two sets of sealed pool specifications, brochures for the pool, filter and pump, and a survey that shows the fence whether it’s new or existing. The Engineering Department’s grading memo asks for three proposed grading plans, signed and sealed by an NJ professional engineer:

  • Scale no smaller than 1″ = 50′.
  • Spot elevations at least every 50 feet along the property lines.
  • One-foot contours reaching 25 feet into neighboring lots.
  • Tax map sheet, block and lot in the title block.

That’s two sealed spec sets and three sealed grading plans for one pool, before you add a copy for yourself.

Filing and revisions

The Construction page links to an online portal for filing permits electronically, and to an online permit-status check. State rules allow either an electronic or a paper submission, and the two-copy minimum applies to paper. If the Township asks for changes after you file, its Revisions Submittal Form goes in with the revised sheets.

The new-home sheet adds one detail that matters for printing: a copy of the approved plans comes back to you “and must be displayed at the job site.” Keep your own clean set as well.

Contacts: Construction Department 732-294-2053, Zoning 732-294-2068, Engineering 732-294-2070. All are at 1 Municipal Plaza, Freehold, NJ 07728.

Getting the sets printed

For a Freehold deck, that’s one plot plan for zoning, two sets of details for construction and a set for you. Line drawings like these print fine in black and white. Upload the PDF to the Print My Plans order form and pick 18×24, 24×36, 30×42, 36×46 or 36×48. Use the size the sheets were drawn at so the scale holds. Every size is $1.95 a sheet in black and white and $3.75 in color. Order by 3 PM ET, ships same day, arrives as soon as the next day. New customers can take 20% off their first order with code WELCOME20, which can’t be combined with other codes.

Nearby guides: Manalapan · Howell · Monmouth County plan printing · all NJ town guides

Summarized from Freehold Township’s published checklists and the NJ Uniform Construction Code, checked Oct 18, 2026. Not legal advice. Several Township sheets are years old, so confirm counts with the office before you print.

Sources (official, accessed Oct 18, 2026)